Accurate, Focused Research on Law, Technology and Knowledge Discovery Since 2002

FERC Staff issues Final Environmental Impact Statement on the Broadwater LNG Project

Press release: “The staff of the Federal Energy Regulatory Commission (FERC or Commission) in cooperation with the U.S. Coast Guard (Coast Guard); U.S. Environmental Protection Agency; U.S. Army Corps of Engineers; National Oceanic and Atmospheric Administration, National Marine Fisheries Service; and the New York Department of State has prepared a final EIS for a liquefied natural gas (LNG) import terminal and natural gas pipeline (referred to as the Broadwater LNG Project) proposed by Broadwater Energy LLC and Broadwater Pipeline LLC (jointly referred to as Broadwater).
The proposed LNG terminal would be located in New York State waters of Long Island Sound, approximately 9 miles from the nearest shoreline of Long Island, and about 10 miles from the nearest shoreline in Connecticut. The terminal consists of a floating storage and regasification unit (FSRU) that would be attached to a yoke mooring system (YMS) which includes a mooring tower embedded in the seafloor. The FSRU would look like a marine vessel and would remain moored in place for the duration of the Project (expected to be 30 years or more). The YMS would allow the FSRU to pivot or “weathervane” around the YMS, enabling the FSRU to orient in response to the prevailing wind, tide, and current conditions.”

  • Browse or search list of projects around the country
  • Sorry, comments are closed for this post.